
Building Scale Mock-up
Until recently, Google has occupied buildings that were designed for others and modified the interiors to suit its needs. Many of the improvements
Until recently, Google has occupied buildings that were designed for others and modified the interiors to suit its needs. Many of the improvements
The reaches of architecture are inherently linked to the efficacy of communication, and as emerging technology broadens the conceptual horizon of the
This paper develops a framework of considerations for the development of project specific performance criteria for the design of art museums and
Adaptive facade systems are a promising approach to achieve a dynamic response to varying weather conditions and user demands. The interdisciplinary
Thermal bridging through building façades have been overlooked by designers and building energy codes and standards in the past, which has led to
Facades play a relevant role in the search for a more sustainable approach to modern architecture. The amount of embodied and operational energy can
Today's sustainability in architecture takes into consideration the complete life cycle of buildings and their components, from resource harvesting
The building envelope is at the intersection of embodied and operational emissions. Curtain wall specifically could play an important role in
Responsive facade system is considered a major component of high-performance building envelope that is capable of responding to environmental stimuli
Cost-effective, sustainable, self-actuating, thermally-responsive, bio-composite exo-skins that act like shields or cloaks for existing buildings
During the particularly cold first months of 1977 President Jimmy Carter, in what some call “The Sweater Speech,” famously noted how much energy
This research unlocks the relationship between space, structure and light in nine unique museums developed by architect Renzo Piano. Renzo Piano uses
The construction industry is one of the greatest sources of pollution, where 39% of global energy-related carbon emissions are attributed to
As the first phase of a $4 billion dollar, 180-acre, 60 building government preservation project in Washington DC, this case study reviews the