472 results

  • Heat-Treated Glass featured image

    Heat-Treated Glass

    What was once an accepted reality in heat-treated exterior glass, optical disturbances in glass are under increasing scrutiny by developers,…
  • 3rd Annual ACAW Ceramic Workshop 2018 Recap

    2018 teams included; Morphosis, SHoP Architects, Sasaki/Studio NYL, University at Buffalo, AECOM, and Radical Matter. The ACAWorkshop is an outstanding model of industry-academia partnership aimed at the ongoing education of students and practitioners alike.

  • Challenges of Tall Iconic Building Retrofit featured image

    Challenges of Tall Iconic Building Retrofit

    Change happens, for better or for worse, to all living and physical matter. In order to thrive and achieve longevity, we constantly need to adapt to…
  • 2019 Request for Research concept Briefs

    The FTI Research Committee is requesting Research Concept Briefs describing a team and approach for evaluating industry needs and challenges surrounding four key topic areas in which FTI has identified a need to accelerate innovation. The proposed research will clearly identify knowledge gaps and ba

  • United States Olympic and Paralympic Museum featured image

    United States Olympic and Paralympic Museum

    Advanced fabrication processes combined with parametric 3D modeling give designers and architects the freedom and versatility to push the boundaries…
  • Episode 09: Ted Kesik on SKINS

    Special guest Ted Kesik, PhD, Professor of Building Science at the University of Toronto, joins us to discuss everything from digital workflows and durability to embodied carbon and resilience.

  • Net Zero Tower

    John Neary describes a collaborative Advanced design Studio at City Tech that involved Permasteelisa, Skanska and Onyx Solar, with links to the published student works.

  • Form Follows Well-Being

    Recent planning recognizes a growing demand for buildings that provide higher levels of occupant well-being. Often, well-being in buildings is

  • Translation from Concept to Construction featured image

    Translation from Concept to Construction

    Fidelity between the built enclosure and early visualizations is rarely, if ever, an accident. When achieved, it comes as the result of persistent…
  • Slipping through the Cracks

    We construct building enclosures to keep the elements out, but sometimes air and water infiltrate the building envelope, causing several problems for

  • The Evolution of AEC Professional Silos featured image

    The Evolution of AEC Professional Silos

    Healthcare projects in northern California require specialized knowledge to navigate regulation, technological advancements, and project execution…
  • Comparison of Historical Weathered Annealed Glass Failure Data to ASTM E1300

    Historical published weathered annealed failure data consisting of 13 samples were collected and glass failure prediction model surface flaw

  • Parametric Louver System

    The Parametric Louver System is a customized tool that expedites several design iterations while embedding multiple design parameters. The ambition

  • Mastery of Measurement

    The conventional approach to specifying dimensional tolerances in architecture and construction is inadequate in the theater of premanufacturing…
  • Managing Solar Reflections from the Building Envelope

    Understanding how a building will reflect sunlight has gone from a rare requirement to a key consideration during the planning permission process in

  • Academic Wood Tower Choreography featured image

    Academic Wood Tower Choreography

    With an ever-growing interest in mid- and high-rise mass timber construction, this paper highlights the insights and lessons learned across global…
  • Addressing Embodied Carbon featured image

    Addressing Embodied Carbon

    Reducing greenhouse gas emissions from the building sector is critical to limiting global temperature rise to less than 1.5⁰C. Construction and…
  • Terracotta 1912 to 2018 featured image

    Terracotta 1912 to 2018

    Center Three is a 100-year-old, one million square-foot building in Long Island City, New York that was constructed over the course of one year. It…