Exploring Interoperability between Rhino and Revit through Rhino.inside
<p>This paper presents a comprehensive interoperability workflow achieved between Rhino and Revit through Rhino-Inside. The study focuses on two case…
<p>This paper presents a comprehensive interoperability workflow achieved between Rhino and Revit through Rhino-Inside. The study focuses on two case…
<p>Integration and interoperability between Building Information Modeling (BIM) and Building Energy Modeling (BEM) tools pose major challenges for…
Architectural design freedom achieved on high-end projects currently costs over $1,000/sq. Ft. Building materials have long been relegated to plane
Today's evolving digital tools allow designers to be more creative in designing new forms and geometries. Adapting similar tools to the fabrication
<p>There have been three decades of liberating developments in the application of descriptive geometry and freeform design methods, as well as the…
<p>As facades become more sophisticated and complex, more detail-intensive and performance-critical, it's vital that architecture students develop a…
Energy codes across the country are progressively getting stricter and increasing the threshold for a baseline building’s energy performance.
The wonder of nature is the abundance of unique forms she creates based on a few simple physical principles or laws. No two snowflakes are alike.
The pathway to carbon-neutrality, as urged during the COP 21 in Paris, and the repeated goal for resilient buildings and urban habitats, winds right
<p>Business Insider has described San Francisco’s Chase Arena as setting “<em>a new standard for a sports arena in the US</em>”, and “<em>the…
<p>Advanced fabrication processes combined with parametric 3D modeling give designers and architects the freedom and versatility to push the…
Healthcare projects in northern California require specialized knowledge to navigate regulation, technological advancements, and project execution
On a commercial high-rise tower project located in Hong Kong, the design team was challenged to make a facade that would beneficial to tenants with a
This paper outlines the successful implementation of digital workflows between the design team composed of Architect, Structural Engineer and Project
<p>An assessment workflow was created to simulate and evaluate the performance of a kinetic facade in an interior space. It includes parameters of…